Operator’s Responsibility
Section 4 – Pre-operation
Section 4 – Pre-operation
4.1 Operator’s Responsibility
It is the responsibility of the operator, prior to each
work shift, to perform the following:
1. Visual and Daily Maintenance Inspections
▪
are designed to discover any damage of
components before the MEWP is put into
service.
▪
are done before the operator performs the
function tests.
WARNING
Failure to locate and repair damage, and discover
loose or missing parts may result in an unsafe
operating condition.
2. Function Tests
▪
are designed to discover any malfunctions
before the MEWP is put into service.
IMPORTANT
The operator must understand and follow the step-
by-step instructions to test all MEWP functions.
The operator should make a copy of the Operator’s
Checklist (see
Section 4.4
) and fill out the visual
and daily maintenance inspections and the function
tests sections while performing the items outlined in
Section 4.2
and
Section 4.3
.
IMPORTANT
If MEWP is damaged or any unauthorized variation
from factory-delivered condition is discovered,
MEWP must be tagged and removed from service.
Repairs to the MEWP may only be made by qualified/
competent repair personnel. After repairs are
completed, the operator must perform visual and daily
maintenance inspections & function tests again.
Scheduled maintenance inspections shall only be
performed by a qualified/competent person.
Summary of Contents for SJ85AJ
Page 1: ...OPERATING MANUAL SJ85AJ ARTICULATING BOOMS 208932AEA November 2018 AS...
Page 4: ...208932AEA SJ85AJ 4 Notes...
Page 18: ...208932AEA SJ85AJ 18 Notes...
Page 62: ...208932AEA SJ85AJ 62 Notes...
Page 68: ...208932AEA SJ85AJ 68 Notes...
Page 69: ...SJ85AJ 208932AEA 69 Section 7 Technical Diagrams Specifications...
Page 78: ...208932AEA SJ85AJ 78 Notes...
Page 102: ...208932AEA SJ85AJ 102 Notes...
Page 104: ...208932AEA SJ85AJ 104 Notes...
Page 105: ......
Page 106: ...www skyjack com...