208932AEA
SJ85AJ
40
Section 4 – Pre-operation
Visual & Daily Maintenance Inspections
Fuel Leaks
▪
Ensure that there are no fuel leaks.
WARNING
Engine fuels are combustible. Inspect the MEWP
in an open, well-ventilated area away from heaters,
sparks and flames. Always have an approved fire
extinguisher within easy reach.
▪
Ensure fuel tank, hoses and fittings show
no visible damage and no evidence of fuel
leakage.
4.2-7 Base
1
Turret Transportation Lock
▪
Ensure turret transportation lock is unlocked,
there are no loose or missing parts and there
is no visible damage.
Drive Axles
▪
Ensure front drive axle
2
and rear drive axle
3
are properly secured, there are no loose
or missing parts, all fittings and hoses are
properly tightened and there is no evidence of
hydraulic leakage.
4
Tie Rod
▪
Ensure there are no loose or missing parts,
tie rod end studs are locked and there is no
visible damage.
5
Oscillating Cylinder Assembly
▪
Ensure oscillating cylinder assembly is
properly secured and there are no visible
gaps, loose or missing parts, all fittings and
hoses are properly tightened and there is no
evidence of hydraulic leakage.
NOTE
Oscillating axle is locked when MEWP is in low
speed. Refer to
Figure 31 - Axle Oscillation
Diagram
.
1
3
2
4
5
5
Summary of Contents for SJ85AJ
Page 1: ...OPERATING MANUAL SJ85AJ ARTICULATING BOOMS 208932AEA November 2018 AS...
Page 4: ...208932AEA SJ85AJ 4 Notes...
Page 18: ...208932AEA SJ85AJ 18 Notes...
Page 62: ...208932AEA SJ85AJ 62 Notes...
Page 68: ...208932AEA SJ85AJ 68 Notes...
Page 69: ...SJ85AJ 208932AEA 69 Section 7 Technical Diagrams Specifications...
Page 78: ...208932AEA SJ85AJ 78 Notes...
Page 102: ...208932AEA SJ85AJ 102 Notes...
Page 104: ...208932AEA SJ85AJ 104 Notes...
Page 105: ......
Page 106: ...www skyjack com...