DOL 535 • DOL 539
Technical Manual
7
2 Procedure
This technical manual deals with the installation of the controller and and is aimed primarily at the technicians
and electricians who will be mounting, installing and testing the controller.
According to current national and in Europe also EU regulations, the installation must be carried out by expert
personnel.
Note that electrical equipment may not be opened without removing the supply voltage, and only competent per-
sonnel may carry out servicing operations and troubleshooting.
In the manual the menus are depicted as tables with primary menus and
sub-menus. The outline is used to give an overview of the setting options
as well as to see where in the menus a given setting can be found.
If a setting is only available in some variants or in specific setups, it is in-
dicated in the table.
It is also possible to search for a function in the search field in the upper
left corner of the page
Settings
.
The individual functions and settings are described in the following sec-
tions which are presented in the same order as the menus.
The following checklist indicates the main points of the work flow regarding set up of the house controller.
Mounting
1. House controller.
2. Emergency opening, if applicable.
Installation
1. Connect cables according to the circuit diagrams for the emergency opening of the system.
2. Set voltage in the controller.
3. Connect mains voltage to the controller.
4. Select components in the house controller's menu
Technical | Installation | Installation wizard
by
reviewing all points in the Installation Installation wizard.
5. Connect the individual components by means of the controller's menu
Technical | Installation |
Show connections
and the circuit diagrams.
6. Customize the controller page views to show precisely those functions and values used in the individual
house.
7. Adjust the system.
8. Test the system.
Start-up
1. Setting and calibration.