Section 04
ENGINE
Subsection 09
(ROTARY VALVE, COOLANT PUMP AND RESERVOIR)
04-09-8
Step
: Align 360° line of degree wheel here
Step
: Find 132° on degree wheel and mark here
1. Opening mark
2. Bottom of
MAG
inlet port
– For
closing
mark, first align 360° line of degree
wheel with TOP of
MAG side
inlet port. Then,
find 52° line on degree wheel and mark crank-
case at this point.
Step
: Align 360° line of degree wheel here
Step
: Find 52° on degree wheel and mark here
1. Top of
MAG
inlet port
2. Closing mark
– Position rotary valve on shaft splines to have
edges as close as possible to marks.
NOTE:
Rotary valve is asymmetrical. Therefore,
try turning it inside out then reinstall on splines to
determine best installation position.
Apply injection oil on rotary valve before closing
rotary valve cover.
To Time Rotary Valve Exactly to
Specifications
NOTE:
If desynchronization (out of spec.) is un-
known, install rotary valve to determine it before
proceeding with the following.
First Method
Turn crankshaft to bring
MAG
piston to TDC.
Scribed marks of crankshaft and upper crankcase
must align. These marks were scribed to deter-
mine desynchronization.
Install brass gear on rotary valve shaft with its
marked spline 4 positions (splines) away for one
degree of desynchronization. Turn in the opposite
direction of desynchronization. For instance, a ro-
tary valve is retarded by 2.5°, turn brass gear by
10 splines counterclockwise.
Second Method
Turn crankshaft to bring
MAG
piston to TDC.
Scribed marks of crankshaft and upper crankcase
must align. These marks were scribed while de-
terminating desynchronization.
For each degree of desynchronization, rotary
valve shaft should be turned in the opposite direc-
tion by about 5 splines on the rotary valve gear.
Note position of rotary valve gear mark when
brass gear disengages worm gear of crankshaft at
removal of rotary valve shaft. From this position,
turn shaft accordingly then reinstall.
For instance, take a valve advanced by 2°.
1. Position of mark when brass gear disengages worm gear
2. Advanced by 2°
3. Position of mark before installation (about 10 splines from original
position)
1,2, Screw and Rotary Valve Cover
Install O-ring and cover then torque screws to 22
N•m (16 lbf•ft) in a criss-cross sequence.
132
°
F01D2JA
1
2
1
2
1
2
52
°
F01D2KA
1
1
2
2
1
2
A16C18A
1
3
2
Summary of Contents for Formula 500 1998
Page 1: ......
Page 358: ...SKANDIC WT SWT ANNEX 1 ...
Page 359: ......
Page 360: ......
Page 361: ...SKANDIC WT LC ANNEX 2 ...
Page 362: ......
Page 363: ......
Page 364: ...MX Z440 ANNEX 3 ...
Page 365: ......
Page 366: ......
Page 367: ......
Page 368: ......
Page 369: ...MX Z 500 583 670 ANNEX 4 ...
Page 370: ......
Page 371: ......
Page 372: ......
Page 373: ......
Page 374: ...FORMULA Z 583 670 ANNEX 5 ...
Page 375: ......
Page 376: ......
Page 377: ......
Page 378: ......
Page 379: ......
Page 380: ...FORMULA 500 DL 583 DL ANNEX 6 ...
Page 381: ......
Page 382: ......
Page 383: ......
Page 384: ......
Page 385: ......
Page 386: ...FORMULA 500 SUMMIT 500 583 670 ANNEX 7 ...
Page 387: ......
Page 388: ......
Page 389: ......
Page 390: ......
Page 391: ......
Page 392: ...GRAND TOURING 500 583 ANNEX 8 ...
Page 393: ......
Page 394: ......
Page 395: ......
Page 396: ......
Page 397: ......
Page 398: ......