Maintenance instruction and protocol
DAC Professional
6.2 Run a test cycle "Quick-Program"
⇒
Carry out the Fast Program with unwrapped objects. You can stop the drying phase after
2 minutes to save time. Print out the test results and enclose with this service report.
⇒
Check all connections for leakages during the sterilization cycle when the chamber has
built up a pressure.
⇒
Make an acoustic check during the test run for unusual noises (e. g. Clattering of lose
parts when autoclave vibrates.) If there are unusual noises caused by the vacuum pump
e. g. from the cavitation jet, exchange it. Add a protocol print-out and the indicator strip of
the helix-test in the below mentioned field at the end of this report.
⇒
Add the protocol print-outs (stick them in the fields at the end of this protocol)
O
Leakages checked
O
Acoustic check performed
O
Works done: _________________________________________________________
7 Reset the maintenance counter
⇒
Resetting as described in the
separate Instruction
.
O
Done
09/21/2006
13/61
Servicemanual DAC Professional
Summary of Contents for DAC PROFESSIONAL
Page 1: ...b a PROFESSIONAL p j...
Page 7: ...Figure 4 Back view 09 21 2006 5 61 Servicemanual DAC Professional...
Page 56: ...Sirona DAC Professional Process 09 21 2006 54 61 Servicemanual DAC Professional...
Page 60: ...Valve diagram 09 21 2006 58 61 Servicemanual DAC Professional...
Page 64: ......