Cable layout and connections
63
851--164300 / C
1
Run the 100 m data cable from the wheelhouse and down to
the sonar room.
Note
The data cable from the wheelhouse to the sonar room must be
supported and protected along its entire length using conduit
and/or cable trays. The cable must not be installed in close
proximity to high-power cables antenna cables or other possible
sources of interference.
This cable must not be spliced. If it is not long enough, or if an
accident occurs with it, contact your local dealer or Simrad for
advice.
2
Locate the RJ-45 connector (included with the delivery), and
mount the connector
J5
as shown on the cable connection
drawing.
3
Do
not
connect the plug to the Sonar Interface Unit.
→
Cable details on page 161
→
The installation of this cable into the Transceiver Unit is
described later. See page 66.
Summary of Contents for SH80 - REV C
Page 2: ......
Page 14: ...Simrad SH80 X 851 164300 C Blank page...
Page 61: ...Transceiver unit 45 851 164300 C Figure 13 Mounting the Transceiver Unit CD3110A...
Page 196: ...Notes...
Page 197: ...Notes...
Page 200: ......