Installation planning
27
851--164300 / C
In the sonar room, the air inlet should be located in close to the deck
and the outlet as high as possible. A funnel shaped drip-collector
should be mounted below the vent pipes to divert moisture to the
bilge.
On the main deck, the best ventilation is provided when the outlet
pipe is at least four meters higher than the inlet pipe. To keep out
sea water, rain and spray, the ventilation pipes should be fitted with
goosenecks of the equivalent.
Conduit
If the cable between the wheelhouse and the sonar room passes
through hatches or areas where it may be damaged, it should be run
through a conduit (two inch conduit is recommended).
Bilge pump
The sonar room should be connected to the vessel’s bilge pump
system. If this is not possible, a separate bilge pump for the sonar
room must be installed.
Lighting
The sonar room should be equipped with suitable lighting to
simplify the installation and aid future maintenance.
Dry docking
Make sure that ample space is provided between the vessel and dry
dock for system installation. To facilitate future dry docking, mark
the position of the installed trunk as indicated.
→
Refer to figure 2 on page 24.
Decking
Once the installation has been completed, the sonar room should
be suitably decked without restricting access to the equipment.
Summary of Contents for SH80 - REV C
Page 2: ......
Page 14: ...Simrad SH80 X 851 164300 C Blank page...
Page 61: ...Transceiver unit 45 851 164300 C Figure 13 Mounting the Transceiver Unit CD3110A...
Page 196: ...Notes...
Page 197: ...Notes...
Page 200: ......