Dry docking
Make sure that ample clearance under the sonar trunk and/or
protection blister is provided when dry docking the vessel. Avoid
locating supporting blocks or structures in the vicinity of this
equipment.
Note
The location of the sonar trunk and/or protection blister must be
noted on the vessel’s docking plan for future reference.
Wiring
The cable from the wheelhouse to the sonar room must be
supported and protected along its entire length using conduits
and/or cable trays. Note that the cable must not be installed in the
vicinity of high-power supplies and cables, antenna cables or other
possible sources of interferences.