19
5.6.1
Casing cover and
control panel dismantling
(fig. 24)
To dismantle the casing cover remove the
screws (1 - 2) that fix it to the control
panel.
To facilitate the maintenance operations
place the
“A”
side of the bracket located on
the R.H. side of the casing so that the con-
trol panel can be hooked on it.
5.6.2Chimney sweep function
To carry out the verification of combustion
in the boiler, turn the selector and stop on
the position (
) until the yellow led (
)
starts to flash intermittently (fig. 25).
From that moment the boiler will start
functioning in heating mode at the maxi-
mum power, with switching off at 80°C
and restarting at 70°C.
Before activating the chimney sweep func-
tion make sure that the radiator valves or
eventual zone valves are open.
The test may be carried out also during hot
water functioning.
To do so it is enough, after having activated
the chimney sweep function, to take some
hot water from one or more cocks; after a
few minutes the request of the D.H.W. sen-
sor is activated and it automatically switch-
es on the led (
).
Even in this condition the boiler functions at
the maximum temperature always with the
primary controlled between 80°C and 70°C.
During the entire duration of the testing the
hot water cocks must remain open.
After verifying the combustion the boiler
should be switched off by placing the selec-
tor on the
OFF
position; then return the
selector to the desired function.
ATTENTION: After about 15 minutes the
chimney sweep function automatically
deactivates.
SPIA GIALLA INTERMITTENTE
Fig. 25
Lato A
Lato A
Fig. 24
1
2
YELLOW LED FLASHING
Side A
Side A
Summary of Contents for Planet Super 4 F.S.
Page 1: ...Planet Super 4 F S Installation Servicing Instructions GB...
Page 27: ......
Page 29: ...Planet Super 4 F S User Instructions GB...
Page 30: ......
Page 41: ...Planet Super 4 W M...
Page 74: ......
Page 75: ......