21
5.8
Expansion vessel
Description
U/M
Edea T
25
35
Total capacity
l
9,0
Prefilling pressure
kPa
100
bar
1,0
Useful capacity
l
5,0
Maximum system content (*)
l
124
(*) Conditions of:
Average operating temperature 70°C (with high tempera-
ture system 80/60°C)
Start temperature at system filling 10°C.
m
CAUTION
– For systems with water content exceeding the
maximum system content (as indicated in the ta-
ble) an additional expansion vessel must be fitted.
– The difference in height between the relief valve
and the highest point of the system cannot exceed
6 metres. If the difference is greater than 6 me-
tres, increase the prefilling pressure of the expan-
sion vessel and the system when cold by 0.1 bar
for each meter increase.
5.9
Circulation pump
The flow-head performance curve available for the heating
system is shown in the graph below.
RESIDUAL HEAD (mbar)
0
0
800
1000
1200
1400
600
400
200
100
200
300
400
500
600
700
35
25
FLOW (l/h)
Fig. 14
The flow-head performance curve available for the remote hot
water tank coil is shown in the graph below.
RESIDUAL HEAD (mbar)
0
0
800
1000
1200
1400
600
400
200
100
200
300
400
500
600
700
800
FLOW (l/h)
Fig. 15
m
CAUTION
The appliance is equipped with a by-pass which en-
sures water circulation in the boiler when thermo-
static valves are used in the system. The heating sys-
tem design should incorporate a room thermostat.
Thermostatic radiator valves fitted to all radiators
except the room where the room thermostat is fit-
ted. Properties with floor areas exceeding 150squre
metres should be zoned.
Summary of Contents for 8116910
Page 4: ...4 ...
Page 14: ...14 ...
Page 54: ...54 9 EXPLODED VIEWS Frame ...
Page 55: ...55 Hydraulic assembly ...
Page 56: ...56 Exchanger Combustion ...
Page 57: ...57 Control panel ...
Page 58: ...58 Gas valve Air gas duct Fan ...
Page 79: ...79 ...