![Silicon Graphics Origin 350 User Manual Download Page 80](http://html.mh-extra.com/html/silicon-graphics/origin-350/origin-350_user-manual_1271649080.webp)
54
007-4566-001
1: Installation and Operation
3. Ensure that the power switch on the rear panel of each DC-powered NUMAlink and
PCI expansion module that you want to power on is set to the ON (
I
) position. This
switch enables the L1 controllers of the NUMAlink module and PCI expansion
modules to power on after you turn on the circuit breaker of the PDU.
Note:
The Origin 350 base and AC-powered NUMAlink modules do not have a
power switch; when the PDU circuit breaker is on, their L1 controllers are on.
Powering On at the System Console
To power on and boot your system using the system console, follow these steps:
Note:
You must manually power on the TP900 storage module by placing the power
switch(es) in the ON (
I
) position. You must turn this module on before rebooting the
system.
1.
If not yet done so, connect a system console to the server system as described in
“Connecting the System Console” on page 51.
2. If the monitors and other peripherals are equipped with voltage select switches,
verify that they are set for the appropriate AC voltage and plug them in. Note that
they are normally plugged into sources outside the rack system.
3. Turn on the circuit breaker switch of the PDU as shown in Figure 1-31.
Summary of Contents for Origin 350
Page 1: ...SGI Origin 350 Server System User s Guide 007 4566 001 ...
Page 3: ...007 4566 001 iii Record of Revision Version Description 001 June 2003 Original publication ...
Page 4: ......
Page 16: ......
Page 26: ......
Page 50: ...24 007 4566 001 1 Installation and Operation Figure 1 11 Location of Table mounting Feet ...
Page 90: ......
Page 158: ......
Page 180: ......
Page 228: ......
Page 262: ......
Page 274: ......