COPAN 400T/TX - Service Manual
3-11
3.5 Step 4 - Install Cable Management Arm for AP0
The cable management arm holds all cables plugged into the server.
You will need:
•
The Cable Management Arm assembly, including velcro strip and screws
•
A short screwdriver
C
ABLE
M
ANAGEMENT ARM PARTS
1. Cut the Velcro strip into eight equal pieces.