Restarting the CHALLENGE RAID Storage System
47
4.
Move the SP’s power switch to the enable position, as shown in
Figure 3-6.
Figure 3-6
Enabling an SP’s Power
5.
Close the fan module by closing the fan module and moving the
module’s latch to the LOCK position.
6.
Power on the CHALLENGE server(s).
SP B
SP A
Deskside
Rack
SP A
SP B