Place and connect
2.
Remove the transport struts.
NL
b) Remove the cuffs.
3.
Install the covers.
Length of hoses and
connection cable
Connection on the left
4.
Push the covers firmly into place by
applying pressure to the snap-in
hooks.
(~ 105 cm
0 ~ 145 cm
8 ~ 95 cm
@ 60cm ~ 100cm
or
Remove the struts
1.
Loosen and remove all screws in the
vertical shipping struts.
17