To extract the load securing device, proceed as follows:
1. Remove the retaining straps.
2. Remove the spacers such as wooden wedges, air cushions, etc.
4.4.3
Lifting the cabinet off the transport pallet
Use a crane to lower the transportation units from the transport pallets and transport them to the
installation site. Observe the guidelines described in the section "Transport with a crane."
4.4.4
Opening doors in preparation for use
NOTICE
Damage to the locking mechanism caused by incorrectly opening the doors
You can damage the locking mechanism if you open the doors incorrectly.
● When opening the doors, follow the steps described.
● If the locking mechanism is damaged it is essential that you have it repaired before
commissioning the drive system. If this is the case, then contact the Service Center. You
can find the relevant contact persons at "Service & Support".
4.4.5
Checking the shock and tilt indicators inside the cabinet.
Shock and tilt indicators are also located inside the cabinet. Check these as soon as you have
unpacked and opened the device. To perform the check, proceed as described in "Checking
shock and tilt indicators"
NOTICE
Material damage caused by shipping indicators remaining in the device during operation
During operation, the shipping indicators can become detached and fall into the device as a
result of high temperatures. Material or temperature damage may result.
● Remove the shipping indicators before commissioning. Remove any adhesive residue
from the shipping indicators using methylated spirits.
See also
Checking shock and tilt indicators (Page 57)
Preparations for use
4.4 Unpacking the cabinets
SINAMICS PERFECT HARMONY GH150 6SL3826
64
Operating Instructions 05/2020
Summary of Contents for SINAMICS PERFECT HARMONY GH150 6SL3826
Page 2: ...19 06 2020 09 25 V14 00 ...
Page 120: ...Spare parts SINAMICS PERFECT HARMONY GH150 6SL3826 120 Operating Instructions 05 2020 ...
Page 124: ...Service Support SINAMICS PERFECT HARMONY GH150 6SL3826 124 Operating Instructions 05 2020 ...
Page 130: ...Quality documents SINAMICS PERFECT HARMONY GH150 6SL3826 130 Operating Instructions 05 2020 ...
Page 135: ......