![Siemens SIMOTICS M-1PH1 Equipment Manual Download Page 93](http://html.mh-extra.com/html/siemens/simotics-m-1ph1/simotics-m-1ph1_equipment-manual_379037093.webp)
Commissioning
8.2 Checklists for commissioning
1PH1 main motors
Equipment Manual, 09/2021, A5E51077676A-AA
91
Checking the mechanical system
Checking items
OK
Have all touch protection measures for moving and live parts been taken?
Has the motor been correctly mounted and aligned?
Can the shaft be rotated smoothly?
Do the operating conditions correspond to the data specified on the rating plate?
Are all mounting screws, connecting elements, and electrical connections tight and
attached properly?
Do the output elements have the correct setting conditions according to the type?
Examples:
• Have the couplings been aligned and balanced?
• Has the tension of a belt drive been correctly adjusted?
• Have the gear tooth flank and gear tooth tip clearance as well as radial clearance
been correctly adjusted for geared outputs?
Checking the electrical system
Checking items
OK
Has the motor been connected properly so that it can rotate in the specified direction?
Have the minimum insulation resistance values been maintained?
Have the grounding and equipotential bonding connections been correctly established?
Checking monitoring devices
Checking items
OK
Has it been ensured that the motor speed no higher than the maximum speed n
max
can
be reached (is the drive speed limited)?
Have all supplementary motor monitoring devices and equipment been correctly con-
nected and are they functioning correctly?
Summary of Contents for SIMOTICS M-1PH1
Page 1: ......
Page 2: ......
Page 8: ...Introduction 6 1PH1 main motors Equipment Manual 09 2021 A5E51077676A AA ...
Page 12: ...Table of contents 1PH1 main motors 10 Equipment Manual 09 2021 A5E51077676A AA ...
Page 133: ......
Page 134: ......