Overview
1.5 Scope of delivery
Mobile Panels 2nd Generation
20
Operating Instructions, 09/2018, A5E33876626-AC
Basic functions of the LEDs:
●
LED lit green: Link established, no data transmission
●
LED flashes green or amber: Link established, data transfer in progress
You can find information about other possible LED states in the following document:
Operating instructions "SCALANCE X-200"
https://support.industry.siemens.com/cs/ww/en/view/102051962
See also
Connecting the connection box (Page 59)
1.5
Scope of delivery
This section describes the system components in the scope of delivery that you need for
operating a Mobile Panel 2nd Generation.
Mobile Panel 2nd Generation:
●
1 Mobile Panel or fail-safe Mobile Panel
●
1 DVD with documentation and product information
●
1 "Mobile Panels 2nd Generation" Quick Install Guide
The scope of delivery may contain additional documents.
Connection box compact:
●
1 Connection box compact
●
1 DVD with documentation and product information
●
1 Accessory kit with mounting clips
●
1 Installation instruction
The scope of delivery may contain additional documents.
Connection box standard and connection box advanced:
●
1 Connection box
●
1 DVD with documentation and product information
●
1 Installation instruction
The scope of delivery may contain additional documents.
Connecting cable:
●
1 Connecting cable with terminal compartment cover with four screws
●
1 Cable retainer with screw