
Cleaning and Lubricating the Rollers
3.
With the grease supplied, lightly lubricate each roller at the points
shown. Re-assemble the rotor using the new pump rotor mouldings.
Figure 3-12. Lubricating the Rollers
4.
Replace the pump rotor. Make sure the drive pin is located
correctly.
Installing New Pump Tubing
1.
Install the new pump tubing:
a. Date the label a maximum of 3 months ahead.
Figure 3-13. Dating the Pump Tubing Label
Sample Pump
2.
Install the new sample pump tubing:
a. Connect the waste cap connector to the manifold. Push firmly
into position.
b. Place the pump tubes over the rotor knob.
c. Connect the front tube to the measurement block tube, and the
back tube to the manifold.
d. Pull the tube lugs underneath the tensioners.
e. Replace the waste bottle.
Reagent Pump
3.
Install the new reagent pump tubing:
a. Loop the pump tubes over the rotor.
b. Pull the tube lugs underneath the tensioners.
Maintaining the System
Page 3-15
Lubrication Points
Summary of Contents for RAPIDLAB 248
Page 1: ...248 91 001N Rev T 2008 04 Operator s Manual ...
Page 24: ......
Page 96: ......
Page 104: ......
Page 118: ......