BA 5230 en 04/2011
•
Record alignment dimensions.
─ The record must be kept with these instructions.
1
Anchor bolt
2 Support
3 Base plate
4 Washer
5 Hexagon nut
6 Base plate
7 Finegrout concrete
8 Raw foundation
4
5
2
3
7
8
6
1
Fig. 13:
Anchor bolt
Prior to tensioning the anchor bolts, the finegrout concrete must have set for at
least 28 days.
•
Keep anchor bolts in their position by tightening the nut with your fingers.
•
Place the protective sleeve.
•
Place hydraulic tensioning device in position.
•
Initially tension the bolts alternately (for initialtensioning forces, see item 6.17).
•
Using a suitable tool, screw hexagon nuts on as far as the stop.
To ensure correct handling and setting of the initialtensioning tool the manufacturer’s
operating instructions must be adhered to.
The tensioning pressures and/or the initialtensioning forces should be recorded, see also item 7.2.10.
6.4
Assembly of a shaftmounted gear unit with hollow shaft and parallel keyway
The end of the drivenmachine shaft (material C60+N or higher strength) must be provided with a parallel
key to DIN 6885 Part 1 Form A. Furthermore, a centring hole to DIN 332 Form DS (tapped) should be
provided (for the connection dimensions of the drivenmachine shaft, see dimensioned drawing in the
gearunit documentation).