BANY Agent
23
Compact Operating Instruction
Installation
Install the BANY Agent on a 35 mm DIN rail complying with DIN EN 50022.
1. Hang the BANY Agent on the DIN rail and then push it in against the rail until it clips
into place..
2. Fit the connectors for the power supply.
3. Fit the connectors for the digital In/Outputs.
4. Insert the terminal blocks into the sockets on the BANY Agent.
Removing
To remove an BANY Agent from the DIN rail:
1. Disconnect all cables from the BANY Agent
2. Release the lower part of the switch away from the DIN rail.
Summary of Contents for BANY Agent
Page 1: ...BANY Agent 1 Compact Operating Instruction SIEMENS BANY Agent Compact Operating Instructions ...
Page 13: ...BANY Agent 13 Compact Operating Instruction Bild 1 BANY Agent mit TAP ...
Page 15: ...BANY Agent 15 Compact Operating Instruction ...
Page 35: ...BANY Agent 35 Compact Operating Instruction 7 Dimension drawings 7 1 BANY Agent with TAP ...
Page 36: ...BANY Agent 36 Compact Operating Instruction ...
Page 37: ...BANY Agent 37 Compact Operating Instruction ...
Page 38: ...BANY Agent 38 Compact Operating Instruction 7 2 BANY Agent without TAP ...
Page 39: ...BANY Agent 39 Compact Operating Instruction ...