OC/EF Curve Characteristic
Application
IEC Normal Inverse (NI)
ANSI Moderately Inverse (MI)
Generally applied
IEC Very Inverse (VI)
ANSI Very Inverse (VI)
Used with high impedance paths where there is a significant difference
between fault levels at protection points
IEC Extreme Inversely (EI)
ANSI Extremely Inverse (EI)
Grading with Fuses
IEC Long Time Inverse (LTI)
Used to protect transformer earthing resistors having long withstand times
Recloser Specific
Use when grading with specific recloser
Table 2-1
Application of IDMTL Characteristics
2.1.2 Reset Delay
The increasing use of plastic insulated cables, both conventionally buried and aerial bundled conductors, have
given rise to the number of flashing intermittent faults on distribution systems. At the fault position, the plastic
melts and temporarily reseals the faulty cable for a short time after which the insulation fails again. The same
phenomenon has occurred in compound-filled joint boxes or on ‘clashing’ overhead line conductors. The
repeating process of the fault can cause electromechanical disc relays to “ratchet” up and eventually trip the faulty
circuit if the reset time of the relay is longer than the time between successive faults.
To mimic an electromechanical relay the relay can be user programmed for an ANSI DECAYING characteristic
when an ANSI operate characteristic is applied. Alternatively a DTL reset (0 to 60 seconds) can be used with
other operate characteristics.
For protection of cable feeders, it is recommended that a 60 second DTL reset be used.
On overhead line networks, particularly where reclosers are incorporated in the protected system, instantaneous
resetting is desirable to ensure that, on multiple shot reclosing schemes, correct grading between the source
relays and the relays associated with the reclosers is maintained.
FAULT
Clashing
conductors or
re-sealing cable
R1
R2
R3
Electro-mechanical Relay
Time
TRIP
Argus (Inst. Reset)
Time
Argus (DTL Reset)
TRIP
Figure 2.1-3 Reset Delay
Summary of Contents for Argus 7SR21
Page 1: ...Energy Management 7SR21 7SR22 Argus Overcurrent Relay Reyrolle Protection Devices ...
Page 2: ......
Page 4: ...Contents 7SR11 and 7SR12 Page 2 of 2 2018 Siemens Protection Devices Limited ...
Page 185: ...7SR210 Settings Guide Unrestricted 2018 Siemens Protection Devices Limited Page 61 of 61 ...
Page 277: ...7SR220 Settings Guide Unrestricted Page 72 of 107 2013 Siemens Protection Devices Limited ...
Page 382: ...7SR220 Technical Manual Chapter 4 Page 2 of 96 2017 Siemens Protection Devices Limited ...
Page 386: ...7SR220 Technical Manual Chapter 4 Page 6 of 96 2017 Siemens Protection Devices Limited ...
Page 398: ...7SR220 Technical Manual Chapter 4 Page 18 of 96 2017 Siemens Protection Devices Limited ...
Page 414: ...7SR220 Technical Manual Chapter 4 Page 34 of 96 2017 Siemens Protection Devices Limited ...
Page 466: ...7SR220 Technical Manual Chapter 4 Page 86 of 96 2017 Siemens Protection Devices Limited ...
Page 468: ...7SR220 Technical Manual Chapter 4 Page 88 of 96 2017 Siemens Protection Devices Limited ...
Page 470: ...7SR220 Technical Manual Chapter 4 Page 90 of 96 2017 Siemens Protection Devices Limited ...
Page 472: ...7SR220 Technical Manual Chapter 4 Page 92 of 96 2017 Siemens Protection Devices Limited ...
Page 643: ...Unrestricted ...