3
3059
10
2019
-
PJC 221 & 222
DECLARATION OF CONFORMITY
Sleipner Motor AS
P.O. Box 519, Arne Svendsensgt. 6-8
N-1612 Fredrikstad, Norway
Declare that this product with accompanying standard control systems complies with
the essential health and safety requirements according to:
DIRECTIVE 2013/53/EU
DIRECTIVE 2014/30/EU
DIRECTIVE 2014/35/EU
MC_0020
MC_0105
Considerations and Precautions
EN
IMPORTANT
If installing S-link products DO NOT connect any other control equipment to the S-link controlled products except Side-Power original
S-link products or via a Side-Power supplied interface product made for interfacing with other controls. Any attempt to directly control or
at all connect into the S-link control system without the designated and approved interface will render all warranties and responsibilities
for the complete line of Side-Power products connected void and null. If you are interfacing by agreement with Sleipner and through a
designated Side-Power supplied interface, you are still required to also install at least one original Side-Power control panel to enable
effi cient troubleshooting if necessary.
It is the installers responsibility
When installing Side-Power equipment to follow the outlined regulations/ classifi cation rules (electrical/ mechanical) according to
international or special national regulations. Instructions in this guide cannot be guaranteed to comply with global electric/ mechanic
regulations/ classifi cation rules.
It is the installers responsibility
To follow all health and safety laws in accordance with their local outlined regulations/ classifi cation rules.
Before installation, it is important that the installer reads this guide to ensure necessary acquaintance with this product.
The recommendations made in this manual are guidelines ONLY, and Sleipner Motor AS (Side-Power) strongly recommend that
before installation, advice is obtained from a naval architect familiar with the particular vessel and regulations/ classifi cations.
This manual is intended to support educated/ experienced staff and is therefore not suffi cient in all details for professional
installation.
(NB: These instructions are only general instruction. If you are not skilled to do this work, please contact professional
installers for assistance.)
All electrical work must be done by a licensed professional.
IMPORTANT
Faulty installation of the tunnel, thruster or panel will render all warranty given by Sleipner Motor AS void.
MC_0038