
23
8015383/ZUQ7/V1-3/2020-06 | SICK
O P E R A T I N G I N S T R U C T I O N S | TRANSIC151LP
Subject to change without notice
INSTALLATION
3
3.4.3
TRANSIC151LP installation - extractive
Filter recommendation
●
Stainless steel mesh filter: Minimum protection against dirt particles.
●
PTFE filter: For gas with humidity and/or fine dirt particles.
Fig. 7: TRANSIC151LP with sample gas cell
Installing the wall bracket
1
Fasten the wall bracket
Wall bracket dimensions,
see “TRANSIC151LP with wall bracket and sample gas cell
(suitable for PS=10 bar(g))”, page 71
.
2
Fasten the TRANSIC151LP
1
Install the TRANSIC151LP on the wall bracket using the four M6 screws provided.
2
First fix both outer screws in the threads at the bottom of the TRANSIC151LP. This
simplifies fastening the two inner screws when positioning the TRANSIC151LP on the
wall bracket.
3
Tighten all four screws.
CAUTION:
Risk of burns through hot gases
▸
Attach the enclosed warning label to the sample gas cell surface when process
temperatures are >65 °C.
NOTE:
Preparing the gas sample for dirty and wet gas
▸
Filter and dry the gas sample before pumping it into the sample gas cell.
▸
Use a hydrophobic dust filter before the inlet opening of the sample gas cell to
protect the optical components against particle and water.
▸
Replace the dust filter regularly to ensure sufficient throughflow.
▸
Dry the gas through cooling and reheating to guard against condensation in the
sample gas cell.
2
3
4
1
1 = Optionally available assembly bracket
2 = Swagelok connections for Ø 6 mm gas tubes
3 = Max. screw size M6
4 = Wall bracket