Installation
FLOWSIC60 · Operating Instructions · 8014241/YTG9/V1-0/2016-02 · © SICK Engineering GmbH
23
Su
bj
ec
t t
o c
han
ge
w
ith
ou
t n
ot
ic
e
Prior to commencing installation, ensure that the following is provided for:
– Measuring distance between sensors not greater than maximum distance of 10 m
– No obstructions interfere with measuring path (
)
– Maximum cable length of 15 m from SPU to each sensor
– Sensors are mounted on an even surface
– Clearance requirements for the measuring path are considered (
Fig. 7
Installation requirements for sensors
Fig. 8
Clearance requirements for measuring path
Me
as
uri
ng
pa
th
10
m
m
ax
45 - 60°
Positive direction of
air flow
Sensor A
Sensor B
max. permitted
vehicle height
max. 5
°
> 2 m
Clearance