![Shimadzu ICPE-9000 Instruction Manual Download Page 103](http://html1.mh-extra.com/html/shimadzu/icpe-9000/icpe-9000_instruction-manual_1256920103.webp)
8 Maintenance
8-29
(6) Re-engage the bar onto the pouch-like section at the bottom of the right side of the ICPE-9000.
(7) Turn ON the power switch.
NOTE
If the power switch is turned OFF, the spectrometer temperature-control circuit
stops operating. The time required for the spectrometer to stabilize varies with the
external temperature but, if it has been OFF for 1 to 2 hours, 6 hours is required. It
soon recovers, however, after a momentary power interruption.
8.16 Checking Operation of Safety Devices
The operation of the safety devices used with the ICPE-9000 can be checked as described below. Check
the operation of the safety devices on a regular basis (every one month).
(1) Argon gas pressure sensor:
1) Ignite the plasma.
2) Stop the supply of argon gas and check that the plasma is extinguished.
(2) Plasma stand door switch:
1) Ignite the plasma.
2) Open the plasma stand door and check that the plasma is extinguished.
(3) Coolant flow switch for RF coil, RF power supply, and orifice assembly:
1) Ignite the plasma.
2) Stop the supply of coolant and check that the plasma is extinguished
Summary of Contents for ICPE-9000
Page 2: ......
Page 6: ...iv...
Page 14: ...xii 1 3 2 Warning Labels...
Page 16: ...xiv...
Page 20: ...xviii...
Page 26: ...1 Introduction 1 2...
Page 64: ...5 Configuration and Operating Principle of the ICPE 9000 5 26...
Page 74: ...7 Operation 7 6...
Page 106: ...8 Maintenance 8 32...
Page 114: ...9 Maintenance Parts and Consumable Items 9 8...