OPERATOR’S MANUAL
P 36 / 57
10. Replacement of v-belt of horizontal spindle:
a. Disconnect the power source.
b. Take off the two rear cover of machine body.
c. Loosen the four hexagonal bolts ( A ) on the motor mount.
d. Take out V-belt ( B ).
e. Assemble the components in the reverse order once the V-belt is replaced.
Note:
1. Upon installation of V-belts, each one of them shall keep an even and proper tension.
2. Replacements of V-belt shell conform to our company specifications.
Fig.43
Summary of Contents for LC-20VA
Page 1: ...OPERATOR S MANUAL SHARP INDUSTRIES INC 310 370 5990 edition A02 LC 20VSG VH 25 Series ...
Page 14: ...OPERATOR S MANUAL P 11 57 A C B C E G D F H FIG 9 2 Replacement of speed change belt R Fig 10 ...
Page 16: ... OPERATOR S MANUAL P 13 57 P N O J L K M I Q FIG 10 3 Replacement of brake block Fig 11 12 ...
Page 19: ...OPERATOR S MANUAL P 16 57 2 20 VC Headstock FIG 14 ...
Page 30: ...OPERATOR S MANUAL P 27 57 ...
Page 46: ...OPERATOR S MANUAL P 43 57 ...
Page 58: ...OPERATOR S MANUAL P 55 57 SPEED DIAGRAM Motor 50 Hz ...