OPERATOR’S MANUAL
P 56 / 57
11. Cautions
A
、
Machine Operations:
1
、
Check and ensure if the machine bottom and ground base are properly contacted before the
anchor bolts are locked up.
2
、
The machine must be installed upon a solid base.
3
、
Check and see if the motor voltage and power source voltage are conformed.
4
、
Cutters shall be far away from the workpieces when the motor is started or stopped.
5
、
Switched off the power source before gear change.
B
、
Machine Operatiors:
1
、
The machine is be started or operated by an authorized operator only.
2
、
Immediate stop and repair are needed in case of troubles in operations.
3
、
In installation, the machine shall be connected to earth.
4
、
In stop motion, the feed lever shall be placed in the neutral position.
5
、
The machine should be stopped during the inspection on the workpieces.
6
、
In clamping, check and ensure if the workpieces are firmly vised.
7
、
The spindle must be kept clean and lubricated all the time.
8
、
Do not place any tools on the work table to maintain its surface preciseness and smoothness.
9
、
Prior to cutting, wait until the spindle is running steadily after the motor is started.
10
、
Use a brush to clean off the iron fragments.
Summary of Contents for LC-20VA
Page 1: ...OPERATOR S MANUAL SHARP INDUSTRIES INC 310 370 5990 edition A02 LC 20VSG VH 25 Series ...
Page 14: ...OPERATOR S MANUAL P 11 57 A C B C E G D F H FIG 9 2 Replacement of speed change belt R Fig 10 ...
Page 16: ... OPERATOR S MANUAL P 13 57 P N O J L K M I Q FIG 10 3 Replacement of brake block Fig 11 12 ...
Page 19: ...OPERATOR S MANUAL P 16 57 2 20 VC Headstock FIG 14 ...
Page 30: ...OPERATOR S MANUAL P 27 57 ...
Page 46: ...OPERATOR S MANUAL P 43 57 ...
Page 58: ...OPERATOR S MANUAL P 55 57 SPEED DIAGRAM Motor 50 Hz ...