OPERATOR’S MANUAL
P 12 / 57
a. Please refer to Step a to e on motor dismantling.
b. Pull out drawbar ( 1 ) .
c. Take off three concave hexagonal bolts ( 1 ) and use two of them to push up the bearing
cover ( K ).
d. Take down the two concave hexagonal bolts ( L ) setting the pressboards from the top
and take out the bolt housing ( M ).
e. Take off the six concave hexagonal bolts ( N ).
f. Use a soft mallet to hit the belt housing ( Q ) lightly upward so as to disengage it from
the gear hoursing ( P ).
g. Reverse the order of dismantling to restore the assembly once the speed change belt is
replaced.
Note : Replacing speed change belt shall conform to that of our company specifications.
Summary of Contents for LC-20VA
Page 1: ...OPERATOR S MANUAL SHARP INDUSTRIES INC 310 370 5990 edition A02 LC 20VSG VH 25 Series ...
Page 14: ...OPERATOR S MANUAL P 11 57 A C B C E G D F H FIG 9 2 Replacement of speed change belt R Fig 10 ...
Page 16: ... OPERATOR S MANUAL P 13 57 P N O J L K M I Q FIG 10 3 Replacement of brake block Fig 11 12 ...
Page 19: ...OPERATOR S MANUAL P 16 57 2 20 VC Headstock FIG 14 ...
Page 30: ...OPERATOR S MANUAL P 27 57 ...
Page 46: ...OPERATOR S MANUAL P 43 57 ...
Page 58: ...OPERATOR S MANUAL P 55 57 SPEED DIAGRAM Motor 50 Hz ...