OPERATOR’S MANUAL
P 24 / 57
A
、
Trouble Shootings:
1
、
Repiacement of V-Belt and Timing Belt of LC-20VC Miller:
a.
Take up the wire grip and reversing switch.
b.
Take off the side cover of belt wheel housing.
c.
As illustrated Fig.25, loosen adjusting motor handle ( B ) and move the motor forward to
loosen the belt. Turn the V-Belt and let it slip off the belt wheel.
d.
Take off the two hexagonal nuts ( C ) for motor dismounting.
e.
Take out the drawbar ( D ) and drop the quill down to the lowest position.
f.
Push the hi-low speed selector (E) to the right front position.
g.
Dismantle the six concave bolts (H) connecting the belt housing (F) and gear housing (G).
Strike upward the belt housing. V- Belt and timing belt are therefore replaced.
h.
Reverse the aforesaid steps and restore the mechanism once both belts are replaced.
Note
:
Replacement of V-Belt and timing belt shall conform to the manufacturer's specs.
Fig.25
Summary of Contents for LC-20VA
Page 1: ...OPERATOR S MANUAL SHARP INDUSTRIES INC 310 370 5990 edition A02 LC 20VSG VH 25 Series ...
Page 14: ...OPERATOR S MANUAL P 11 57 A C B C E G D F H FIG 9 2 Replacement of speed change belt R Fig 10 ...
Page 16: ... OPERATOR S MANUAL P 13 57 P N O J L K M I Q FIG 10 3 Replacement of brake block Fig 11 12 ...
Page 19: ...OPERATOR S MANUAL P 16 57 2 20 VC Headstock FIG 14 ...
Page 30: ...OPERATOR S MANUAL P 27 57 ...
Page 46: ...OPERATOR S MANUAL P 43 57 ...
Page 58: ...OPERATOR S MANUAL P 55 57 SPEED DIAGRAM Motor 50 Hz ...