![SEW-Eurodrive INTERBUS UFI11A Manual Download Page 20](http://html.mh-extra.com/html/sew-eurodrive/interbus-ufi11a/interbus-ufi11a_manual_1250336020.webp)
5
20
Manual – Fieldbus Interface INTERBUS UFI11A
INTERBUS Interface
5
INTERBUS Interface
5.1
Startup of the INTERBUS master
Project planning of the UFI11A in the INTERBUS interface module with the "CMD Tool"
(CMD = Configuration-Monitoring-Diagnostics) project planning software takes place in
two steps. In the first step, you will set up the bus structure. The second step involves a
station description and address entry of process data.
The following illustrations show the CMD Tool settings for a UFI11A configured with 3PD
+ 2PCP according to Fig. 10 on the input/output addresses 144...149 of the control.
Configuring the
bus structure
Off-line configuration: Insert with ID code
You can configure the bus structure with the CMD Tool on-line or off-line. In the off-ine
status, the drive inverter will be configured with the menu item "Edit / Insert with ID code"
in the CMD tool. In this mode, you will have to enter the ID code, process data channel
and device type according to Fig. 11.
05653AXX
Fig. 10: Project planning example for 3PD + 2PCP
05654AXX
Fig. 11: Off-line configuration with the CMD Tool
Summary of Contents for INTERBUS UFI11A
Page 1: ...INTERBUS UFI11A Fieldbus Interface Edition 06 2002 Manual 1052 5114 EN ...
Page 2: ......
Page 65: ......
Page 66: ......
Page 67: ......