9
INSTALLATION AND OPERATION INSTRUCTIONS — FENCE PROTECTION SYSTEMS
Figure 9. MX-5300 Loop Connections
Connections from the FPS-3 Central Controller to the MX-5300 will be made as shown in Figure 9.
Apply power to the MX-5300 and FPS-3 Central Controller by connecting the AC power first, then the
battery system. Perform initial programming to acknowledge initial alarms.
Perform initial testing of each zone using the self-test function and audio probe of the FPS-3 Central
Controller. Measure the optimum gain and count at each dual zone pre-amp using the
MSI
Field
Performance Analyzer (FPA). Perform fence quieting procedure if necessary.
Complete MX-5300 programming by performing the programming steps needed for your system. For
programming reference, refer to MX-5300 Installation Manual, Table
2
.
Set the FPS-3 dual zone card gain switches for each zone based on your field measurements using the
FPA. Program the counts for each zone on the MX-5300.
Perform final testing, including climb test, in each zone as required by the system specifications.
1 2 3 4 5 6 7 8
LOOP 3
AUDIO
LOOP 2
AUDIO
Tie shield to
chassis ground lug.
2 pair shielded cable to
FPS-3 central controller.
AUDIO TERMINAL BOARD
TB 2
FPS-3 POWER
/COMM BOARD
TB 3
AUDIO +
COMMON
LOOP 1
AUDIO
1 2
-
+
POWER/COMM
BOARD
25 conductor ribbon cable
to FPS-3 central controller.
RED
BLK
BLK
RED