![Sencore SCP 2100 User Manual Download Page 15](http://html1.mh-extra.com/html/sencore/scp-2100/scp-2100_user-manual_1239288015.webp)
SCP 2100
– User Manual
Page 15 (62)
2.1 Installation
The SCP 2100 unit can easily be deployed almost anyplace. The size is small enough
that the unit can be placed on a desk, an equipment rack or a shelf on a test bench.
2.2 Power Connection
Using the proper power connections is vital to the safe operation of the SCP 2100. Only
use the supplied 3-prong power connector or one with equal specifications. NEVER
tamper with or remove the 3
rd
– prong grounding pin. This could cause damage to the
SCP 2100, personnel, or property.
2.3 AC Power Connection
The SCP 2100 is intended for use on either 120V or 240V systems. The power supply will
automatically detect the system it is connected to. To hook up the power use the following
steps:
1. Locate the AC power cord that was included with the SCP 2100.
2. Plug the female end of the power cord (end with no prongs) into the back of the
unit.
3. Locate a protected outlet to plug the male end of the power cable into.
2.4 Maintenance
The SCP 2100 is virtually a maintenance-free piece of equipment. There are no user
serviceable parts on the inside of the unit