Generator Auto Start
The next tab enables you to change the conditions under which the generator will start to improve the state of
charge in the batteries or run at scheduled times.
GENERATOR LOCK OUT OVERRIDE During the generator lockout period
there is still a point that, below which, your SP PRO will start the generator
to prevent battery damage. There are two “failsafe” settings.
One is controlled by battery voltage. With this system the generator will
be called on to charge the batteries when your battery voltage falls to a
low limit as set by the 0% battery load voltage and the 100% battery load
voltage (see section under Inverter Settings). The generator will run for
the Minimum Run Time.
When the ON LOW SoC is enabled and the state of charge falls below
Start SoC at any time during the lockout period the generator will start
and run for the minimum run time or until the SoC reaches Stop SoC.
The ON SoC NORMAL setting applies at times other than when other SoC
Start Stop functions are active including during Generator Lock Out times.
If SoC falls below Start SoC% the generator will be started and will charge
until Stop SoC% or for Generator Min Runtime if Stop SoC% is reached
before the minimum runtime has elapsed.