INSTALLATION | Installation of SPLC models
44
|
Doc #OI0003 Part #004122 Rev 04 2010
Installation of SPLC models
1
-
Undo ten bolts (
7
/
16
“) to remove
lid. Cardboard tray contains mounting
plate, rear air outlet mesh cover and all
documentation.
Inspect for damage in transit and report any
to your supplier immediately.
2
- Cable entry is either from below or wall
entry by flipping position of inter changeable
gland plates. Gland plates secure to the
underside of unit base or to the inside of the
mounting plate using four T10 Torx screws.
3
- Choose a suitable weight bearing and
temperature resistant surface to install the
mounting plate. Max temperature is ambient
+30
°C
, weight is 105 kg. The plate should be
mounted at a convenient level.
There should be no obstructions to the clear
passage of air.
Wall or cavity cables may now be fitted
through gland plate.
4
- Undo 10 bolts (
7
/
16
“) to remove sides from
the packing base. Undo 8 bolts (
7
/
16
“) to
remove clamps from handles
HEAVY
: Take care when lifting - 105 kg
SHARP
: Use gloves - handle edges sharp.
TOP HEAVY
: Secure unit when standing
upright.
Stand unit upright using handles.
REAR AIR OUTLET MESH COVER
: Fit and
secure with six thumb screws
5
- Mount the SP PRO on the mounting plate
by first hooking the top of the inverter over
the projections on the mounting plate and
lowering it into position. Care should be taken
to observe Pinch Point warning. Secure the
bottom of the inverter to the mounting plate with
two M6 bolts provided.
6
- Remove the cover plate by unscrewing
two thumbscrews near bottom of SP PRO.
Expansion card remains secured to
SP PRO.