Basic Rider Optimization Training for the Segway
HT
Page 87 of 106
Instructor Guide and Participant Workbook
Rev 3.5i - January 2004
© Segway LLC 2002
P/N 1707100001aa
Summary
Review these processes in preparation for the Operation and Maintenance Assessment exercise.
>
Bring the Segway HT to an open area using Power Assist Mode
>
Note the Battery Pack Charge level.
>
Check the Control Shaft for tightness/rotation and tighten Control Shaft Clamp bolt if
necessary.
>
Check the tire air pressure.
>
Perform brief external inspection of Segway HT including:
o
Tires
o
Wheels
o
Battery Packs
o
Fenders
o
Mat
o
Handlebar orientation
>
Remove and replace Control Shaft.
>
Remove and replace Battery Packs.
>
Ride the Segway HT.
>
Turn off the Segway HT.
>
Plug your Segway HT into AC power
>
Confirm that the Segway HT is charging.
>
Deploy the Parking Stand (i Series only).
>
Unplug your Segway HT and retract the Parking Stand
>
Turn on the Segway HT.