![Seaga JDL-2 COMBO Service And Parts Manual Download Page 15](http://html1.mh-extra.com/html/seaga/jdl-2-combo/jdl-2-combo_service-and-parts-manual_1221707015.webp)
15
JDL V1.0 8 2022
Figure 14 –
Retainer in Load Position
Retainer
2.) 20 oz/591 ml Bottles are loaded lying down, two deep in each column. Load the first bottle so that
the top touches the back of the column. The next bottle should also be loaded with the top toward
the back of the column, positioned against the bottom of the first bottle.
3.)12 oz/355 ml Cans (not slim cans) are loaded lying down, three deep in each column. Load cans with
the top of the first can touching the back of the column. The bottom of the next can should be touching
the bottom of the first can. The third can should be loaded with the top touching the top of the second
can.
4.)Finish loading to the top of the column, not exceeding maximum capacity (see chart), making sure
the items are not tilted or skewed in the column.
5.)With column loaded, lift the Retainer back into sales position using the Locking Tab and push down
to lock.