Fig. 18
Fig. 19
70 mm
70 mm
63,5
mm
46 mm
POSITIONING OF THE FRONT BRACKET
Once the operator is attached to the post and the leaf set in the closed position execute the following
operations:
1. Release the operator.
2. Pull-out completely the chromate shaft and push it back in 1cm.
3. Attach the shaft to the front bracket (Fig. 17).
4. Set the operator perfectly levelled and mark the position of the front bracket (Fig.16).
Attention:
avoid the welding of the front bracket to the shaft of the hydraulic operator already attached; the
welding scraps (daps) could ruin the chromium plating of the shaft.
Front bracket welded
Front bracket screwed
WELDING OF THE FRONT BRACKET TO THE GATE
The front bracket must be positioned so that the operator is perfectly levelled
According to the nature of the gate the front bracket (wood, steal, Aluminium) can be:
FULL TANK
English
English
Fig. 17
Fig. 16
Sistemi Elettronici
di Apertura Porte e Cancelli
®
22