Fig.27
RISK EXAMINATION
The points pointed by arrows
are potentially dangerous. The installer must take a thorough risk examination to prevent
crushing, conveying, cutting, grappling, trapping so as to guarantee a safe installation for people, things and animals.
(
)
As for misunderstandings that may arise refer to your area distributor or call our help desk. These instructions are part of the
device and must be kept in a well known place.The installer shall follow the
provided intructions thoroughly.
products must only be used to automise
doors, gates and lwings. Any initiative taken without
explicit authorization
will preserve the manufacturer from whatsoever responsibility. The installer
shall provide warning notices on not assessable further risks.
in its
relentless aim to improve the products, is allowed to make whatsoever
adjustment without giving notice. This doesn’t oblige
to up-grade the past
production.
can not be deemed responsible for any damage or accident
caused by product breaking, being damages or accidents due to a failure to
comply with the instructions herein. The guarantee will be void and the
manufacturer responsibility will be nullified if
original spare parts are not
being used.
Packaging materials such as plastic bags, foam
polystyrene, nails etc must be kept out of children’s reach as dangers may arise.
in fig. 27
Re. Laws in force in the country where installation has been made.
SEA
SEA
SEA
SEA
SEA
SEA
The electrical installation shall be carried out by a professional
technician who will release documentation as requested by the laws in force.
INITIAL TEST AND STARTING OF THE AUTOMATION
After having completed the necessary operations for a correct installation of the Full Tank product, as described in this manual,
and after having valuated all resting risks which could arise in any installation,
it is necessary to test the automation to guaranty
the maximum security and, in particular way, to
guaranty that the laws and norms of this sector are
fully respected
. Especially the test must be executed
following the norm
EN 12445
which establishes the
methods of tests for checking the gate automations
respecting the limits established by the rule
EN 12453.
SAFETY GATE
For a correct and safe installation it is strongly
recommended to install a Safety Gate,
which allows
the fulfilment of the force diagram included in the
norm EN 12453
and consequently the test and start of
the whole installation.
SAFETY PRECAUTIONS:
All electrical work should conform to current regulations. A 16 A 0,030 A differential switch must be incorporated into the source of
the operators main electrical supply and the entire system properly earth bonded. Always run mains carrying cables in separate
ducts to low voltage control cables to prevent mains interference.
INTENDED USE:
The operator Full Tank has been planed to be used for the automation of swing gate operator only.
SPARE PARTS:
To obtain spare parts contact:
SEA S.p.A. -Zona Ind.le, 64020 S. ATTO Teramo Italia
SAFETY AND ENVIRONMENTAL COMPATIBILITY:
Don’t waste product packing materials and/or circuits.
When being transported this product must be properly packaged and handled with care.
LIMIT OF GUARANTEE
For the guarantee see the sales conditions on the official SEA price list.
MAINTENANCE AND OUT OF SERVICE:
The decommission and maintenance of this unit must only be carried out by specialised and authorised personnel.
NOTE: THE MANUFACTURER CAN NOT BE DEEMED RESPONSIBLE FOR ANY DAMAGE OR INJURY CAUSED BY
IMPROPER USE OF THIS PRODUCT.
SEA
reserves the right to do changes or variations that may be necessary to its products with no obligation to notice.
FULL TANK
English
English
Fig.28
Sistemi Elettronici
di Apertura Porte e Cancelli
®
26