![SCIEX NanoSpray Operator'S Manual Download Page 34](http://html1.mh-extra.com/html/sciex/nanospray/nanospray_operators-manual_1217533034.webp)
Figure 4-9 Connecting the Sample Line to the Union
16. Insert the fused silica, PEEK sleeve, and fitting into the upstream side of the union, making sure that they are
completely seated in the union.
17. While holding the tubing in place, tighten the fitting.
18. Move the X-Y-Z positioning unit toward the ion source interface slowly, until it stops, making sure that the
emitter tip does not strike the curtain plate.
Adjust the Illuminator and Camera
WARNING! Electrical Shock Hazard. Never operate the NanoSpray
®
ion source
without the illuminator, camera, stop, and covers properly installed. Never
touch the curtain plate or allow the emitter tip to contact the curtain plate.
If the mass spectrometer is operational and the ion source is installed, then
high voltage is present on the curtain plate, even if the X-Y-Z positioning
unit is moved away from the interface.
Adjust the illuminator and camera to obtain the best possible images on the monitor.
Adjust and Focus the Camera
1. Move the X-Y-Z positioning unit along the positioning rails, away from the ion source interface, until it is
stopped by the sleeve. This automatically disconnects the supply of high-voltage power to the ion source head.
2. Turn on the monitor and adjust the camera until the curtain plate aperture is visible on the monitor.
Tip!
If no image appears on the monitor, then make sure that the monitor and camera cables are connected,
and that the illuminator is on. Refer to
Operator Guide
NanoSpray
®
Ion Source
RUO-IDV-05-0811-F
34 / 92
NanoSpray
®
III Head Assembly and Installation