50
Copyright © 2020 Axxiom Manufacturing, Inc.
8.13.
Maintenance Schedule Quick Reference Chart
AIRPREP AIR DRYER SYSTEM MAINTENANCE SCHEDULE
ITEM
MAINTENANCE
REQUIRED
DAILY WEEKLY
MONTHLY
QUARTERLY
Blaster
Vessel
Hydrostatic Test
See Section 8.1
As required by state law and/or local authorities
Blaster
Vessel
Check for exterior damage
(corrosion, dents, bulges).
See Section 8.2
X
Blaster
Vessel
Check for interior damage
(corrosion / pitting).
See Section 8.3
X
Moisture
Accumulation
Open all drain ball valves to
purge moisture and debris.
See Section 8.4
X
Aftercooler
Clean & inspect radiator, fan,
shroud, guard, & motor
See Section 8.5
X
Air Motor
Fill air motor lubricator.
See Section 8.5.4.
X
Deliquescent/
Desiccant
(ADS Systems
only)
Check level of deliquescent/
desiccant inside separator tank
See Section 8.6
X
Control Hoses
& Wires
Check control hoses & wiring for
bare spots, fraying, or cracks
See Section 8.7
X
Air Hose
Couplings
Check for safety pins
and whip checks
See Section 8.8
X
Hose
Coupling
Gaskets
Check for leaky air and blast hose
coupling gaskets
See Section 8.9
X
Personal
Protective
Equipment
Check condition of all
personal protective equipment See
Sections 3.10 and 8.10
X
Warning
Decals
Check the condition of
warning decals.
See Sections 0.0 and 8.11
X
Handway
Assembly
Check gasket for wear, cracking,
or dry rotting.
Check sealing surfaces for
damage.
See Sections 6.3 and 8.12.
X
Summary of Contents for ACS 1200
Page 8: ...8 Copyright 2020 Axxiom Manufacturing Inc THIS PAGE IS INTENTIONALLY BLANK ...
Page 54: ...54 Copyright 2020 Axxiom Manufacturing Inc 9 2 a ACS 400 2500 Aftercooler System Air Motor ...
Page 62: ...62 Copyright 2020 Axxiom Manufacturing Inc 9 6 a ADS 400 2500 Air Dryer System Air Motor ...
Page 66: ...66 Copyright 2020 Axxiom Manufacturing Inc 9 8 a ADS 400 2500 Air Dryer System Electric Motor ...
Page 75: ...Copyright 2020 Axxiom Manufacturing Inc 75 NOTES ...