3
Operation
3.1
Start-up and Initial Preparation
A"#$0$
Page 14
A
rt
.-
no
.:
2
.5
4
0
0
37
R
ev
.:
a
3 Operation
3.1 Start-up and Initial Preparation
3.1.1
Connecting AT-101
(1) Potential equalisation
(2) Mains connection (115 or 230 V)
(3) RS-232 (see safety note paragraph
(4) Printer (see safety note paragraph
Fig. 3.1
AT-101 back panel
!
Danger of electrical shock. Do not operate the unit if the earth connection is sus-
pect or if the mains lead is damaged or suspected of being damaged.
1. Check Voltage setting (2) 115 or 230 V. Refer to chapter
for the mains voltage.
2. Connect the power cable at the rear of the unit.
The mains indicator lamp (6) is always lit when the unit is connected to the mains
supply. If the unit is switched on, the relevant symbol is displayed on the LCD (7)
Leave the AT-101 connected to the mains for 7 hours to fully charge the battery.
3. Connect the potential equalisation cable and all other necessary cables at the
rear of the AT-101.
4. Press the
on/off
button (5). The patient data or the ECG acquisition screen is dis-
played (see paragraph
.)
5. Check the settings according to chapters
6. Connect the patient cable on the right side panel.
5
7
6
Summary of Contents for AT-101
Page 1: ...A 0 ervi e andboo3 Art no 7 5400 Rev a 400 A 0 7 annel E G Devi e ...
Page 6: ...Page 4 Art no 2 540037 Rev a ...
Page 42: ...5 Care Maintenance 5 2 Functional test A 0 Page 40 Art no 2 540037 Rev a ...
Page 63: ...Page 61 Appendix 8 A 0 Service Handbook Checklist 8 1 Art no 2 540037 Rev a Other remarks ...
Page 64: ...8 Appendix 8 1 Checklist A 0 Page 62 Art no 2 540037 Rev a ...