6
– MAINTENANCE (ROUTINE AND SPECIAL)
COD.
60M12/24.D.2018
EN
THE PRESENT MANUAL BELONGS TO -
Schenker Italia
- ALL RIGHTS RESERVED
45
6.5.2
Shutdown operating procedure
1.
Prepare the solution carefully mixing the bottle of
SC1 in about 15 liters of unchlorinated water.
2. Connect the 2 hoses to the pump group and
watermaker as indicated above, and dip them in
the solution.
3. Check they are well dipped in the solution and
don't inhale air.
4. Open the depressurization valve
(turn counterclockwise).
Hoses under the free water surface