Operation Manual VISATRON® VN115/87plus EX
06/2016
Page 42
SCHALLER AUTOMATION
D-66440 Blieskastel / Saarland / Germany / Industriering 14 / P.O Box 1280
Industrielle Automationstechnik GmbH & Co. KG
Tel. +49(0)6842-508
-
0
/ Fax -260 / eMail: [email protected] / www.schaller.de
Figure 43:
Step 4
is to exchange the 2 bellows if necessary. The bellow is
secured by a ring which is fixed by two screws.
Figure 44
Step 5
is to pull out the gaskets before the carrier plate is mounted
To finish the assembly execute the first 2 steps in reverse order.
Figure 45
Step 6
is to check the electrical grounding
Upper bellow
of the suction
channel
Dismounted
rubber sealing
before start of
assembly
Fixing screws
Electrical
grounding has
to be
checked!