![Savage Light F-106 DELTA DART Construction Manual Download Page 37](http://html1.mh-extra.com/html/savage-light/f-106-delta-dart/f-106-delta-dart_construction-manual_1203385037.webp)
85. Sand the cockpit rails and stringer flush with
the bulkheads. Use 3/32” contest balsa to
sheet or strip plank the nose section between
B1T and B6T. (Photo 99)
NOTE: Be sure to leave an 1/8” overhang
when you sheet between B3T and C1 to
simulate the instrument hood.
86. Glue cockpit sides C3 to C1 and B4T. (Photo
100)
87. Finish sheeting or strip planking the the
fuselage turtle deck between bulkheads B4T -
B6T. Be sure to leave a lip on B6T for the rest
of the upper fuselage sheeting and the inlet
duct walls. (Photo 101)
Photo 99
Photo 100
Photo 101
35
Savage Light Industries
F-106 Delta Dart