SAS GRO-ECO Technical - Start - Up Documentation Download Page 21

 

 

 

 

 

 

21

 

 
 

In  order  to    recycle    the  boiler  worn  device  deliver  to    specialized  recycling  unit, 
according to detailed regulations being in  force in the country of  destination.  

 

 
 
 

 

1. Manufacturer  grants  warranty for proper functioning  of the  heating  boiler SAS 

GRO-ECO, what is confirmed with the stamp of  factory.                                                                                                                          

 

2. Manufacturer grants warranty for the period covering

  

the boiler installed and 

operated  according  to  all  terms  and  recommendations  included  to  Technical -
Start-Up Documentation (TSD).                      

 

3. A buyer gets together with terms of warranty hereby Technical-Start-Up-

Documentation (TSD),  which is laid down rules for the proper operation and safe 
exploitation of the  heating  boiler.  Hereby documentation (TSD) must be reading 
careful and it is obligatory. 

 

4. Warranty terms are binding from the date of the purchase for the period of:                                                                                    

a. 5 years * for efficient functioning of the boiler,  
b. 2 years on electronics and automation components mounted on the boiler and 

produced by other manufacturers:  

 controller 

 blowing fan 

 safety valve 

 automatic fuel delivery system (details of the manufacturer warranty) 

 

5. Warranty does not cover consumable items:  

 sealant (rope)  

 capacitor 

 sensors                                                                                                                                            

 

6. Manufacturer is obligated to carry out the charge free repair under warranty in time 

period of 14 days starting from the date of application (done by user).                                                      

 

7. Boiler’s repair, the construction or insulation alterations made by user or other 

third parties – will cause the warranty to be invalid.  

 

8. Application of reclamation should be addressed at manufacturer.   

 

 

9.  Boiler  replacement  realized  by  manufacturer  is  only  possible  based  o  expert 

opinion, that repair is not workable. 

 

10. If the advertiser does not allow double-warranty repairs, despite the willingness of 

the  guarantor  to  comply  with  it,  is  deemed  to  have  resigned  from  the  advertiser 
claims contained in the application of reclamations.                                                                                                             

 
 
_________________________________________________ 

*

boilers of power 48 kW and higher are cover with 24-months warranty 

 

10.

 

BOILER’S RECYCLING

 

11.

 TERMS OF WARRANTY 

 

Summary of Contents for GRO-ECO

Page 1: ...K I 28 100 Busko Zdr j Owczary ul Przemys owa 3 Phone 48 41 378 46 19 Fax 48 41 370 83 10 TECHNICAL START UP DOCUMENTATION of water boilers for heating installations SAS GRO ECO type adopted for black...

Page 2: ...o electrical installation 10 7 Operation and exploitation guidelines 10 7 1 Filling with water 10 7 2 Firing up and functioning of a boiler 10 7 2 1 Firing up and functioning of a boiler in automatic...

Page 3: ...3...

Page 4: ...4...

Page 5: ...lculated feeding water temperature does not exceed 85 C and working pressure does not exceed 1 5 bar Required gases draught pressure after a boiler is 0 30 0 55 mbar depending on boiler s power These...

Page 6: ...antage is a simple operation relaying on periodic coal bunker refueling the fuel bunker and cinder removing from the ash drawer with no requirement to stop the boiler Once boiler is fired up it does n...

Page 7: ...g coal should not tend to stick when burner Volatile particles content 30 40 It is recommended to use coal which is prone to agglomeration coking although it is good caloric properties higher losses o...

Page 8: ...OTE Employing of mechanical blow out ventilation is unacceptable The boiler room should be provided with day and artificial lighting 6 2 BOILER ARRANGEMENT Special foundation for boiler is not require...

Page 9: ...required to apply flue insert however in year round exploitation it is recommended to provide heating to the hot utility water container 6 4 CONNECTING BOILER TO HEATING INSTALLATION The boiler should...

Page 10: ...y allowing the air residing in the installation to be removed It is accomplished when water is going out of overflow pipe When filling the heating system installation with water it is recommended to l...

Page 11: ...el quality may cause the boiler to burn out If the fire is out during up phase the furnace should be cleaned and boiler s channels ventilated and the whole starting procedure must be repeated Once boi...

Page 12: ...sition of the gate valve At the same time the controller operates the heating system circulation pump if such is provided Heat requirement in the heat installation is varying due to changing outdoor c...

Page 13: ...Required chimney draught mbar 0 30 0 45 9 Exhaust temperature C 90 210 10 Recommended heating water working temp C 60 80 11 Maximal allowable working temperature C 85 12 Maximal allowable operating pr...

Page 14: ...chimney draught mbar 0 55 9 Exhaust temperature C 90 210 10 Recommended heating water working temp C 60 80 11 Maximal allowable working temperature C 85 12 Maximal allowable operating pressure bar 1 5...

Page 15: ...turn water connector pipe 13 blowdown connection 14 lateral washout hole door 15 blowing fan 16 feeder drive mechanism 17 deflector 18 retort burner 19 water jacket 20 ash box 21 safety valve 22 aerat...

Page 16: ...controller 11 smoke conduit cleaning hole 12 smoke conduit 13 smoke throttle 14 safety valve 15 upper washout hole cover 16 hot water connector pipe 17 fuel storage bin 18 blowing fan 19 feeder drive...

Page 17: ...hed or when switching off the boiler is scheduled the controller should be then switched off and the glowing batch should be removed from retort and push into ash box chamber Once boiler is out and co...

Page 18: ...lung if its amount is excessive 3 Control fuel level in the hopper 4 Check the hopper and shielding pipe against coal dust accumulation if required remove it 5 Check if air nozzles are not damaged and...

Page 19: ...en temperature and pressure rise installation valves closed open the valves pressure vessel frozen heat the pressure vessel Water licking out of boiler so called boiler s sweating this is natural proc...

Page 20: ...llic sensor is faulty If temperature of 95 C is exceeded cutting off power supply to blow in fan and fuel feeder is executed FUEL BUNKER PROTECTION A controller is additionally protected against flame...

Page 21: ...components mounted on the boiler and produced by other manufacturers controller blowing fan safety valve automatic fuel delivery system details of the manufacturer warranty 5 Warranty does not cover...

Page 22: ...eserves the right to introduce changes in the construction of the product for modernization purpose Such changes may not be reflected in hereby documentation however basic described properties of the...

Page 23: ...23 SERVICE REPAIRS...

Page 24: ...erature boiler of SAS GRO ECO type installed and operated in pursuance of Technical Start Up Documentation Boiler no Heating capacity Heated surface Year of manufacture Manufacturer signature and stam...

Reviews: