SAS GRO-ECO Technical - Start - Up Documentation Download Page 14

 

 

 

 

 

 

 

   

 w

h

e

n

 w

o

rk

in

g

 a

a

v

e

ra

g

e

 lo

a

d

 (

5

0

%

 o

ra

te

d

 p

o

w

e

r)

/

 r

a

te

d

 lo

a

d

 

**

   

 if

 m

a

n

u

fa

c

tu

re

re

c

o

m

m

e

n

d

a

ti

o

n

re

g

a

rd

in

g

 h

e

a

tin

g

 w

a

te

te

m

p

e

ra

tu

re

 r

a

n

g

e

a

re

 n

o

o

b

se

rv

e

d

b

o

ile

m

u

st

 

b

e

 o

b

lig

a

to

ry

 c

o

n

n

e

c

te

d

  t

o

 c

e

n

tr

a

l h

e

a

tin

g

 s

y

st

e

m

 e

q

u

ip

p

e

d

 w

it

h

 t

h

re

e

- o

fo

u

– w

a

y

v

a

lv

e

p

ro

te

c

ti

n

g

 

a

g

a

in

st

 s

o

 c

a

lle

d

 „

 lo

w

 t

e

m

p

e

ra

tu

re

c

o

rr

o

si

o

n

   

 C

 h

a

n

d

le

 u

se

 t

o

 t

ra

n

sp

o

rt

 a

 b

o

ile

d

im

e

n

si

o

n

 1

5

0

 m

m

 

No. 

Parameter 

Unit 

SAS GRO-ECO 

1. 

Boiler power  

kW 

73 

100 

125 

150 

200 

250 

275 

2. 

Boiler heated surface 

m

2

 

6.5 

9.0 

12.0 

14.0 

18.0 

23.0 

26.0 

3. 

Boiler efficiency 

%

 

81,7 ÷ 87,8 

4. 

Fuel consumpcion* 

kg/h 

6,2 

8,4 

10,5 

12,6 

16,8 

21,0 

23,5 

5. 

Load chamber capacity 

dm

3

 

kg 

360 

~260 

460 

~340 

520 

~380 

580 

~420 

720 

~540 

860 

~640 

940 

~700 

6. 

Boiler water capicity 

310 

430 

490 

540 

620 

690 

720 

7. 

Boiler weight (without water) 

kg 

840 

1370 

1480 

1830 

2350 

2850 

3150 

8. 

Required chimney draught 

mbar 

0,55 

9. 

Exhaust temperature 

°C 

90 ÷ 210 

10. 

Recommended heating water working 
temp. 

°C 

60 ÷ 80 

11. 

Maximal allowable working temperature 

°C 

85 

12. 

Maximal allowable operating pressure 

bar 

1,5 

13. 

Minimal return water temp.** 

°C 

55 

14. 

Power supply 

V/Hz 

~230 / 50 

15. 

Power consumption 

up to 280 

up to 360 

up to 900 

16. 

D

im

e

ns

io

ns

 

mm 

1475 

1820 

1960 

2100 

2170 

2420 

2520 

A1 

310 

420 

470 

500 

570 

720 

720 

1415 

1750 

1960 

1960 

1960 

2350 

2350 

B1 

740 

820 

940 

940 

940 

1140 

1140 

1580 

1730 

1730 

1800 

1960 

1960 

1960 

H1 

1485 

1610+c* 

1610+c* 

1675+c* 

1800+c* 

1800+c* 

1800+c* 

H2 

1250 

1360 

1350 

1420 

1520 

1515 

1505 

630 

760 

860 

860 

960 

960 

1060 

250 

300 

300 

350 

350 

440 

440 

17. 

Smoke conduit diameter    

mm 

245x225 

315x305 

340x325 

360x345 

400x405 

460x455 

480x480 

18. 

Connector pipe diameter (supply/return) 

G 2½ 

G 3 

19. 

Min. chimney height 

10 

11 

12 

14 

20. 

Minimal chimney dimensions/diameter 

cmxcm 

mm 

26x26 
Ø 320 

28x28 
Ø 360 

29x29 
Ø 380 

32x32 

Ø 400 

32x32 

Ø 400 

34x34  
Ø 420 

34x34  
Ø 420 

TECHNICAL AND OPERATING PARAMETERS OF SAS GRO-ECO BOILER

 

Summary of Contents for GRO-ECO

Page 1: ...K I 28 100 Busko Zdr j Owczary ul Przemys owa 3 Phone 48 41 378 46 19 Fax 48 41 370 83 10 TECHNICAL START UP DOCUMENTATION of water boilers for heating installations SAS GRO ECO type adopted for black...

Page 2: ...o electrical installation 10 7 Operation and exploitation guidelines 10 7 1 Filling with water 10 7 2 Firing up and functioning of a boiler 10 7 2 1 Firing up and functioning of a boiler in automatic...

Page 3: ...3...

Page 4: ...4...

Page 5: ...lculated feeding water temperature does not exceed 85 C and working pressure does not exceed 1 5 bar Required gases draught pressure after a boiler is 0 30 0 55 mbar depending on boiler s power These...

Page 6: ...antage is a simple operation relaying on periodic coal bunker refueling the fuel bunker and cinder removing from the ash drawer with no requirement to stop the boiler Once boiler is fired up it does n...

Page 7: ...g coal should not tend to stick when burner Volatile particles content 30 40 It is recommended to use coal which is prone to agglomeration coking although it is good caloric properties higher losses o...

Page 8: ...OTE Employing of mechanical blow out ventilation is unacceptable The boiler room should be provided with day and artificial lighting 6 2 BOILER ARRANGEMENT Special foundation for boiler is not require...

Page 9: ...required to apply flue insert however in year round exploitation it is recommended to provide heating to the hot utility water container 6 4 CONNECTING BOILER TO HEATING INSTALLATION The boiler should...

Page 10: ...y allowing the air residing in the installation to be removed It is accomplished when water is going out of overflow pipe When filling the heating system installation with water it is recommended to l...

Page 11: ...el quality may cause the boiler to burn out If the fire is out during up phase the furnace should be cleaned and boiler s channels ventilated and the whole starting procedure must be repeated Once boi...

Page 12: ...sition of the gate valve At the same time the controller operates the heating system circulation pump if such is provided Heat requirement in the heat installation is varying due to changing outdoor c...

Page 13: ...Required chimney draught mbar 0 30 0 45 9 Exhaust temperature C 90 210 10 Recommended heating water working temp C 60 80 11 Maximal allowable working temperature C 85 12 Maximal allowable operating pr...

Page 14: ...chimney draught mbar 0 55 9 Exhaust temperature C 90 210 10 Recommended heating water working temp C 60 80 11 Maximal allowable working temperature C 85 12 Maximal allowable operating pressure bar 1 5...

Page 15: ...turn water connector pipe 13 blowdown connection 14 lateral washout hole door 15 blowing fan 16 feeder drive mechanism 17 deflector 18 retort burner 19 water jacket 20 ash box 21 safety valve 22 aerat...

Page 16: ...controller 11 smoke conduit cleaning hole 12 smoke conduit 13 smoke throttle 14 safety valve 15 upper washout hole cover 16 hot water connector pipe 17 fuel storage bin 18 blowing fan 19 feeder drive...

Page 17: ...hed or when switching off the boiler is scheduled the controller should be then switched off and the glowing batch should be removed from retort and push into ash box chamber Once boiler is out and co...

Page 18: ...lung if its amount is excessive 3 Control fuel level in the hopper 4 Check the hopper and shielding pipe against coal dust accumulation if required remove it 5 Check if air nozzles are not damaged and...

Page 19: ...en temperature and pressure rise installation valves closed open the valves pressure vessel frozen heat the pressure vessel Water licking out of boiler so called boiler s sweating this is natural proc...

Page 20: ...llic sensor is faulty If temperature of 95 C is exceeded cutting off power supply to blow in fan and fuel feeder is executed FUEL BUNKER PROTECTION A controller is additionally protected against flame...

Page 21: ...components mounted on the boiler and produced by other manufacturers controller blowing fan safety valve automatic fuel delivery system details of the manufacturer warranty 5 Warranty does not cover...

Page 22: ...eserves the right to introduce changes in the construction of the product for modernization purpose Such changes may not be reflected in hereby documentation however basic described properties of the...

Page 23: ...23 SERVICE REPAIRS...

Page 24: ...erature boiler of SAS GRO ECO type installed and operated in pursuance of Technical Start Up Documentation Boiler no Heating capacity Heated surface Year of manufacture Manufacturer signature and stam...

Reviews: