1 2
3 4
10
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
3) Attach the communication and power wires
from your kit to the communication and power
wires in the gang box. See the sections of this
manual labeled “3-Wire Synchronous (Sync-Wire)
Communication Wiring Information” or “2-Wire
Digital Communication Wiring Information” for
additional details, depending on your system.
Wall Mount Installation - Round SlimLine Clock
1) If you are installing a new gang box in the wall,
leave at least 4 inches between the top of the gang
box and ceiling. Confirm that the bottom of the
gang box is level with the floor.
If you are using an existing gang box, the top of the
gang box must be a minimum of four inches away
from the ceiling.
4) If you do not wish to attach the mounting piece
to the gang box, proceed to step 5A. Otherwise, go
to step 6.
2) Run power and communication wiring to the
gang box. See the sections of this manual labeled
“Wiring Information” for additional details,
depending on your system.
If you are using a 2-wire system, pull the
YELLOW and GREEN wires out of
the connector.
CHECK YOUR WIRING
The voltage between the white and black wires
should measure 105-126 volts AC in the 115
volt model, 207-253 volts AC in the 230 volt
model, or 21.5-26.5 volts AC in the 24
volt model.
If you are using the 24 volt model, make sure
that the wiring leading to the clock is from an
ISOLATED transformer.
Ceiling
Minimum