51
Power management
Time left before Lamp is off.
Power management
For reducing power consumption as well as maintaining
the lamp life, the Power management function turns off the
projection lamp when the projector is not operated for a
certain period.
Select one of the following options:
Ready
.................. When the lamp has been fully cooled
down, the POWER indicator changes
to green blinking. In this condition, the
projection lamp will be turned on if the
input signal is reconnected or any button
on the top control or remote control is
pressed.
Shut down
.......... When the lamp has been fully cooled
down, the power will be turned off.
Off
....................... Power management function is off.
Timer
................... If the input signal is interrupted and
no button is pressed for more than
30 seconds, the timer display with
No
signal
appears. It starts the countdown
until the lamp is turned off. Use the Point
54
buttons to set the Timer(1~30min.).
Note:
Factory default is
Ready: 5 Min
.
Setting
Summary of Contents for PLC-XU300A
Page 78: ...KA5AE SANYO Electric Co Ltd ...
Page 88: ...10 Chapter 1 Preparation ...
Page 89: ...ENGLISH 11 ENGLISH Chapter 2 Setup Procedures 2 Describes how to configure the network ...
Page 120: ...42 Chapter 4 Controlling the Projector ...
Page 136: ...NETWORK OWNER S MANUAL SO KF5AE SANYO Electric Co Ltd ...
Page 141: ...5 PJ NETWORK MANAGER OWNER S MANUAL Chapter 2 Set up 2 ...
Page 143: ...7 PJ NETWORK MANAGER OWNER S MANUAL Chapter 3 Basic Operation 3 ...
Page 168: ...PM KF5AC PJ NETWORK MANAGER OWNER S MANUAL FOR WINDOWS SANYO Electric Co Ltd ...