OfficeServ 7200-S
INSTALLATION
TECHNICAL MANUAL
PART 1 JANUARY 2011
7
CONNECTING STATIONS AND ADDITIONAL EQUIPMENT
7.1 CONNECTING STATIONS .................................................................................................. 7.1
7.2 CONNECTING ADDITIONAL EQUIPMENT ................................................................. 7.27
8
POWER UP PROCEDURES
8.1 PRE-CHECK ............................................................................................................................ 8.1
8.2 STARTING THE SYSTEM .................................................................................................... 8.1
8.3 CHECKING THE FAN ........................................................................................................... 8.2
8.4 NUMBERING EXTENSIONS AND C.O. LINES ............................................................... 8.3
9 SOFTWARE AND DATABASE MANAGEMENT
9.1 SOFTWARE MANAGEMENT WITH MP20S INSTALLED ........................................... 9.1
9.2 DATABASE MANAGEMENT ............................................................................................. 9.1
10
ADDING CARDS TO THE SYSTEM
10.1 ADDING STATIONS AND TRUNKS ............................................................................... 10.1
Figure List
Figure 2.1
Tools Required for Rack Installation
Figure 2.2
Rack Installation (1)
Figure 2.3
Rack Installation (2)
Figure 2.4
Rack Installation (3)
Figure 2.5
Rack Installation (4)
Figure 2.6
Tools Required for Wall Installation
Figure 2.7
Wall Installation (1)
Figure 2.8
Wall Installation (2)
Figure 2.9
Wall Installation (3)
Figure 2.10 Wall Installation (4)
Figure 2.11 Wall Installation (5)
Figure 2.12 Wall Installation (6)
Figure 2.13 Grounding
Figure 3.1
Front Panel Configuration
Figure 3.2
Back Panel Components
Figure 3.3
MP20S Switch Settings
Figure 3.4
Installing the Processor Board (1)
Figure 3.5
Installing the Processor Board (2)
Home Page