Safety
[Figure 2-3: PV connections]
To connect 3.6 kWh All In One with the Public Grid, make sure to install the watt-hour meter
recommended by Samsung SDI (refer to the installation manual) and to install the
distribution box between 3.6 kWh All In One and the Grid watt-hour meter. Before installing
the distribution box, select a suitable location complying with the IP21 and use the
equipment recommended by the installation company. Please note that failure to do so may
cause malfunction and the product will not be guaranteed for any accident or damage.
Refer to the installation manual for further information. The [Figure 2-4] shows the complete
connection line as described so far.
[Figure 2-4: Distribution box connection diagram]
8
Australia (Eng.) 05/2015. Rev1.1